One. Tender Conditions

This project is the civil construction and installation project of the north wing wind shaft of Shaanxi Yonglong Energy Development and Construction Co., Ltd., with self-financing. The project has already met the bidding conditions, and the project is now subject to public bidding.

2. Project Overview and Scope

1. Project Address: Cui Mu Coal Mine, Linyou County, Baoji City

2. Bidding Unit: Shaanxi Yonglong Energy Development and Construction Co., Ltd.

3, equipment use: north wing air shaft civil engineering and installation project.

4. Project sub-item name (2 bid sections)

(1) The auxiliary shaft derrick fabrication project.

(2) Installation items of derrick and shaft equipment.

3. shortlisted supplier qualification requirements

1. Enterprise qualification requirements: The bidder shall be a legal person organization that has the ability to independently bear civil liability and is legally registered within the territory of the People's Republic of China, and can provide a valid business license (business scope is consistent with the subject matter) or a legal person registration certificate of an institution;

2. Performance requirements: at least two similar project performances have been completed since January 1, 2020;

3, financial requirements: in recent years, the financial situation is good (subject to the audit report audited by a third party);

4. Reputation requirements: good performance and no record of bad behavior in the past three years;

5. The auxiliary shaft derrick production project must conform to the qualification of the coal mine industry and have the production performance of a single derrick with a total weight of more than 400 tons (the diameter of the sky wheel is 5.5 meters).

6, derrick and shaft equipment installation project must have coal mine construction general contracting second-level or above qualification.

7. The bidding unit must have units with relevant professional qualifications and relevant professional performance.

8, this project does not accept the consortium bid.

Pre -4. Information Requirements

1, perfect and detailed enterprise introduction: including company profile, organizational performance, etc. is not limited to the required information.

2. Unit certificate: business license, account opening license and qualification certificate; Please provide other certificates (such as quality certification, credit certificate, etc.).

3. Performance certificate: signed contract total price page and signature page or bid-winning notice.

Please send the above 3 items of pre-trial information to the recipient's mailbox in scanned form.

5. supplier registration deadline and document acquisition

1. The recruitment announcement will be released from April 17, 2023 to 17:00 on April 22, 2022.

2. Relevant information such as qualifications submitted by bidders participating for the first time can only participate in technical exchanges and later bidding after being approved.

3. The bidding documents are limited to offline purchase, and the purchase time and bidding time shall be determined after technical exchange.

6. Recipient Information:

Contact: Manager Guo Tel: 18992770011 Mailbox: 870859183 qq.com